Episode 24 introduces ‘Model Uses’, the intended or expected deliverables of using 3D models on projects. This peer-reviewed article clarifies the term from an information management perspective. It then delivers a comprehensive Model Uses List that can be used to populate project protocols and facilitate performance assessment.
El índice de madurez BIM
Después de haber presentado las diferencias básicas entre Capacidad BIM y Madurez BIM en el Episodio 11 y de haber tratado brevemente sobre los muchos y relevantes modelos de madurez en el Episodio 12 (aún no traducido), este post introduce una nueva herramienta especializada para medir el desempeño BIM: el Índice de Madurez BIM (BIMMI).
Episode 21: The Eight Components of Market Maturity
BIM ThinkSpace Episode 21 introduces the Macro Maturity Components model which can be used to: (a) assess a country’s current BIM diffusion policy, (b) compare the BIM maturity of different countries, and (c) assist policy makers in developing a comprehensive BIM national initiative or diffusion policy. The model includes eight components (e.g. Legal Framework, Education, and Technology Infrastructure), each assessed using specialised metrics at five levels of maturity.