
This numbered Frameworks Page covers a single Visual Knowledge Model (VKM). Refer to Tags at the bottom for content classification and source publication if any. The page may be updated to connect with newer Frameworks Pages. The number is for pages, not for content.
Published on December 1, 2013 | Last Updated on September 20, 2025
Also available in Spanish, Catalan, German, French, Italian, and Greek
The BIM Framework introduces the stages separating Pre-BIM (the status before BIM) from viDCO (virtually integrated Design, Construction and Operation) – the ultimate vision from implementing BIM. These revolutionary stages, and the evolutionary steps separating them, are intended to both clarify and measure BIM adoption.
Note 1: this model depicts BIM Capability Stages at Maturity Level C…Also, starting in Paper A4, the term viDCO replaces the term IPD as used earlier in Papers A2 and A3
Note 2: The ‘BIM Stages’ model was first introduced by the author through BIM ThinkSpace (Episode 8 – Feb 18, 2008) and then published in Paper A2 as ‘BIM Maturity Stages’. As of Paper A3, the BIM capability/maturity concept embedded in the original model was split into two metrics/models: BIM Capability Stages and BIM Maturity Levels.
Update (July, 2015) – below is a short video explaining the above on the Framework’s YouTube channel:
Cite as: BIMe Initiative (2025), '3. BIM Stages', https://bimexcellence.org/frameworks/bim-stages/. First published 1 December 2013. Viewed 27 September 2025