This numbered Frameworks Page covers a single Visual Knowledge Model (VKM). Refer to Tags at the bottom for content classification and source publication if any. The page may be updated to connect with newer Frameworks Pages. The number is for pages, not for content.

26. Macro Maturity Components

Published on July 20, 2014 | Last Updated on September 20, 2025

Macro-Maturity-Components-v1.2Macro Maturity Components – also available in Spanish, Russian, and Italian

The Macro Maturity Components model (updated Nov 17, 2014) identifies eight complementary components for measuring and establishing the relative and absolute BIM maturity of Macro Organizational Scales (Market, Defined Market and Sub-Market). The eight components are:

  1. Objectives, stages and milestones
  2. Champions and drivers
  3. Regulatory framework
  4. Noteworthy publications
  5. Learning and education
  6. Measurements and benchmarks
  7. Standardised parts and deliverables
  8. Technology infrastructure

The components are measured individually and collectively using the BIM Maturity Index (BIMMI) which includes 5 levels: (a) initial/ad-hoc, (b) defined, (c) managed, (d) integrated, and (e) optimised.

Note: the Macro Maturity Components model is discussed in BIM ThinkSpace Episode 22 (published Jan 27, 2015).


Note 1: the Macro Maturity Components model was first introduced as “BIM Implementation Components at Defined Market Scale v0.1” at the “8th IBS Roundtable: Mechanisation through Building Information Modelling (BIM), November 2011 – Malaysia”. Click here to view the superseded model.

Note 2: the current version benefited from the excellent feedback and model validation efforts of Dr Mohamad Kassem of Teesside University (UK).

Cite as: BIMe Initiative (2025), '26. Macro Maturity Components', https://bimexcellence.org/frameworks/macro-maturity-components/. First published 20 July 2014. Viewed 27 September 2025

Leave a Reply