Mechanical Installer
Providing digital handover information for installed equipment
Print / save as PDF (opens in a new tab)
New here? A persona is a short, realistic story about one person at work. Not a real person, but built from real jobs, projects and rules.
- A role
- A situation
- The steps they take
- What to learn and read
The story in three frames
What the job looked like, what changed, and where they need to get to.
Six steps, and who hands what to whom
You do the steps. The main contractor sends you what you need, and checks what you send back.
You getYou send
You
Mechanical Installer
Find out what's needed
Before you start, ask which details and certificates each item needs.
Agree names and uploads
Agree how files are named and how you will upload them.
Capture as you install
Photograph each item and its data plate; note serial, location and date.
Gather the paperwork
Test results, commissioning sheets, certificates, warranties and manuals.
Check before you send
Check everything against the client's list and the naming rules.
Submit and sign off
Upload the final records for the main contractor to accept.
Main contractor
Checks and accepts
Your choice after step 2: how will you record things on site?
No single right answer. The Report compares the options in detail.
-
A phone or tablet app
Good: captured on the spot
Watch: you still upload it later
-
Paper, then typed up weekly
Good: no gadgets on site
Watch: extra typing, more room for mistakes
-
The main contractor's app
Good: straight into the project system
Watch: depends on their app and some training
Everyone on this school project
Six personas share one made-up school project. Requirements flow down from the client; records flow back up.
The client
The design team
The main contractor
The supply chain
Requirements flow this way
Records flow back this way
What success looks like
By 01/07/2027
- You know what each item needs before you start.
- Details and photos are captured on site with a phone or tablet.
- Product, commissioning, warranty and maintenance records are in the agreed format.
- Compliance records and certificates go in with the handover.
- Nobody has to chase you for missing items.
What you'll learn
Three short learning briefs that match the steps. Suggestions to practise, not certificates.
- 1
Understand what handover needs
Pick out the details each item needs and name files the way the project expects.
90 minutes · Workshop or online · Steps 1 and 2
- 2
Capture equipment data and photos on site
Record data plates without mistakes and photograph pipework before it is covered.
120 minutes · Hands-on · Step 3
- 3
Check and submit handover packages
Put together a complete package per item and spot gaps before the main contractor does.
120 minutes · Computer-based · Steps 4 to 6
Keep these handy
Build Digital materials to keep open while you work.
- Technology Evaluation Methodology
Helps you pick a simple, affordable way to record on site.
Useful at steps 1 and 2
- Project Information Standard – File Naming
How to name files so the project system accepts them first time.
Useful at steps 2 and 5
- Information Management Plan – Delivery Team
Templates showing what information a subcontractor owes, and when.
Useful at steps 1, 5 and 6
Courses
- Digital Construction Technology · Atlantic Technological University
- Building Information Modelling · Atlantic Technological University
- BIM Project Information Practitioner Qualification · BSI (British Standards Institution)
Picked by Build Digital; they open on the provider's website.
Words you'll meet
The jargon on this project, in plain words.
- CDE
- Common Data Environment: the project's shared online filing system.
- BIM
- Building Information Modelling: working with shared, organised digital information about a building.
- Handover information
- What the client needs to run and maintain what you installed.
- Commissioning
- Testing and setting up equipment so it works as designed, and recording the results.
- Naming convention
- An agreed pattern for file names, so every file can be found and checked.
- Lead appointed party
- The formal name for the main contractor here: the firm that hired you.
Want the full picture?
This overview is the first look. Open the detail when you are ready.
Full Scenario Record
A checklist for every step, the sources and evidence, and the full learning briefs.
Open the Full RecordMechanical Installer
I know heating inside out. Digital records for the client? That part is new to me.
A self-employed plumber, hired by the main contractor to fit boilers, pumps and valves at a public school, learns to hand over digital records for every item.
- Works for
- The main contractor
- Business
- Small, self-employed
- Project
- €14m school extension
- BIM Mandate
- Applies
Does this sound like your job?
Good. Start with the six steps.
Use it as a starting point, or meet the others on this project.
Browse all personas to find a closer fit.
New here? What is a persona?
A short, realistic story about one person at work. Not a real person, but built from real jobs, projects and rules.
A roleA situationThe steps they takeWhat to learn and read
The story in three frames
Swipe to see what changed.
Six steps, and who hands what to whom
You do the steps. The main contractor sends what you need and checks what you send back.
Lines marked with the main contractor are what passes between you.
-
1
Find out what's needed
Before you start, ask which details and certificates each item needs.
You get the list of details needed per item
-
2
Agree names and uploads
Agree how files are named and how you will upload them.
You get the naming and upload rules
-
Your choice: how will you record on site?
A phone or tablet app
Good: on the spot. Watch: upload later.
Paper, then typed up weekly
Good: no gadgets. Watch: extra typing.
The main contractor's app
Good: straight in. Watch: needs training.
-
3
Capture as you install
Photograph each item and its data plate; note serial, location and date.
You send equipment details and photos
-
4
Gather the paperwork
Test results, commissioning sheets, certificates, warranties and manuals.
You send commissioning, compliance and warranty records
-
5
Check before you send
Check everything against the client's list and the naming rules.
You get check results and anything missing
-
6
Submit and sign off
Upload the final records for the main contractor to accept.
You send the final packages
You get accepted, or sent back
Missing items come back to step 4
Everyone on this school project
Requirements flow down from the client; records flow back up.
- Project CoordinatorClient
- Information ManagerClient
- Practice PrincipalDesign team
- Design EngineerDesign team
- CEO, main contractorMain contractor
- Mechanical InstallerYou are here
What success looks like
By 01/07/2027
- You know what each item needs before you start.
- Details and photos are captured on site with a phone or tablet.
- Records are in the agreed format.
- Certificates go in with the handover.
- Nobody has to chase you for missing items.
What you'll learn
Three short learning briefs. Suggestions to practise, not certificates.
- 1
Understand what handover needs
90 minutes · Workshop or online · Steps 1 and 2
- 2
Capture equipment data and photos on site
120 minutes · Hands-on · Step 3
- 3
Check and submit handover packages
120 minutes · Computer-based · Steps 4 to 6
Keep these handy
Build Digital materials to keep open while you work.
- Technology Evaluation Methodology
Pick a simple, affordable way to record on site.
Useful at steps 1 and 2
- Project Information Standard – File Naming
Name files so the project system accepts them first time.
Useful at steps 2 and 5
- Information Management Plan – Delivery Team
What a subcontractor owes, and when.
Useful at steps 1, 5 and 6
Courses
- Digital Construction Technology · Atlantic Technological University
- Building Information Modelling · Atlantic Technological University
- BIM Project Information Practitioner Qualification · BSI (British Standards Institution)
Picked by Build Digital; they open on the provider's website.
Words you'll meet
BIM DictionaryCDE
Common Data Environment: the project's shared online filing system.
BIM
Building Information Modelling: shared, organised digital information about a building.
Handover information
What the client needs to run and maintain what you installed.
Commissioning
Testing and setting up equipment, and recording the results.
Naming convention
An agreed pattern for file names, so every file can be found and checked.
Lead appointed party
The formal name for the main contractor here: the firm that hired you.
Want the full picture?
Full Scenario Record
A checklist for every step, the sources and evidence, and the full learning briefs.
Open the Full Record